Laserfiche WebLink
' 19 November 2004 <br /> AGE-NC Project No 99-0559 <br /> Page 7 of 7 <br /> • Continued quarterly ground water monitoring, the next quarterly monitoring event is <br /> scheduled for December 2004 <br /> • Installation of additional, shallow- to Intermediate-depth ground water extraction wells on <br />' the southern and western margin of the site, in order to minimize the lateral migration of <br /> petroleum hydrocarbon-Impacted ground water towards the south and west <br />' Installation of additional CPT monitoring points at the former UST area and west and <br /> southwest of the site to define the Iateral extent of petroleum hydrocarbons-Impacted ground <br /> water, as detailed In the work plan proposed and submitted to the EHD on 03 December <br /> 2003 <br />' 6.0 LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br /> upon analytical results provided by an Independent laboratory Evaluations of the hydrogeologlc <br />' . conditions at the site for the purpose of this Investigation are made from a limited number of <br /> available data points (e g ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or Implied, Is made as to the professional <br /> Interpretations, opinions and recommendations contained In this report <br /> 1 <br /> 1 <br /> 1 <br />' Advanced CeoEnvironrnental,Inc <br /> I <br />