Laserfiche WebLink
• 15 April 2004 <br /> AGE-NC Project No 99-0559 <br /> Page 4of13 <br /> 22 OFF-SITE ASSESSMENT <br /> In September and October 2002, five additional, paired soil bonngs (CPT-4 to CPT-8) were <br /> advanced off-site(Figure 2) TPH-g was detected in ground water samples collected from HU2,HU4 <br /> and Upper HU5 of the off-site soil borings, the maximum concentration was 2,000 µg/1 in HU4 In <br /> addition, BTEX compounds were detected in HU2 <br /> Fuel additives were detected in all hydrologic units The highest concentrations were detected in <br /> HU4, MTBE was detected in HU4 at a maximum concentration of 2,600 µg/I, ETRE and TAME <br /> were detected at 25 µg/1 and 5 6 µg/l,respectively,and TBA and DIPE were detected at 630µg11 and <br /> 18 µg/l,respectively However,only TBA was present in Lower HU5,at a concentration of 180µg/1 <br /> Dissolved MTBE extends off-site past all current sampled locations The concentrations of dissolved <br /> MTBE decreased away from the site, except to the west at CPT4, where the highest concentration <br /> of off-site MTBE was detected <br /> The solvent TCE was detected in HU2 and HU4 In the off-site borings CPT-5 and CPT-8 (Figure <br /> 2),at a maximum concentration of 1,700 µg/1 The TCE appears to originate from an off-site source, <br /> since TCE was not detected in CPT borings (e g , CPT-4 and CPT-6) closer to the site <br /> i <br /> i <br /> The vertical extent of dissolved TPH-g,benzene and MTBE does not extend to below 130 feet bsg <br /> 3 0. INTERIM GROUND WATER REMEDIATION SYSTEM <br /> Ground water remediation system installation and operation were performed in accordance with <br /> procedures descnbed in the approved Interim Remediation and Site Assessment Work Plan, dated <br /> 25 January 2001 and Interim Remediation Work Plan -Addendum, dated 16 September 2002 <br /> A remediation enclosure and fencing for the ground water treatment system was installed on 18 and <br /> 19 February 2003 Ground water remediation equipment was delivered at the site on <br /> 26 February 2003 Between 11 March and 15 April 2003 an associated piping network was Installed <br /> at the site On 01 and 02 April 2003, four ground water extraction wells were installed at the site <br /> The dedicated electncal service was installed on 10 April 2003 The interconnection for the ground <br /> water recovery and treatment system were Installed and Inspected between 05 May and 26 May 2003 <br /> Advanced GeoEnviron mental,Inc <br />