Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> I 0 INTRODUCTION AND SCOPE OF WORK . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I <br /> I <br /> 21 CPT LITHOLOGIC INVESTIGATION 1 <br /> 22 GROUND WATER SAMPLE COLLECTION 2 <br /> 23 SOIL SAMPLE COLLECTION 3 <br /> 24 INSTALLATION OF CMT MONITORING WELLS 3 <br /> 25 PILOT BORING SOIL CORE RECOVERY 4 <br /> 26 GROUND WATER MONITORING WELL COMPLETION 4 <br /> 27 DEVELOPMENT AND SURVEY OF MULTI-LEVEL <br /> MONITORING WELLS 5 <br /> 3.0. FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 31 STRATIGRAPHY 5 <br /> 32 HYDROGEOLOGIC UNITS 6 <br /> 3 3 LABORATORY RESULTS OF "GRAB" GROUND WATER SAMPLES 7 <br /> 34 LABORATORY RESULTS OF SOIL SAMPLES 7 <br /> 4.0. SUMMARY AND CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br />�. 5.0. LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> FIGURES <br /> Figure I -Location Map <br /> Figure 2 -Site Plan <br /> Figure 3 - Cross Section C-C' <br /> Figure 4 - Cross Section D-D' <br /> Figure 5 -Petroleum-Impact Cross Section C-C' <br /> Figure b -Petroleum-Impact Cross Section D-D' <br /> Figure 7 -Design of CMT Wells <br /> Figure 8 -Hydrocarbon-Impacted Soil in Cross Section C-C' <br /> TABLES <br /> ITable 1 -Analytical Results of Grab Water Samples <br /> Table 2 -Analytical Results of Soil Samples <br /> APPENDICES <br /> Appendix A - CPT Logs <br /> Appendix B - Soil Boring Logs 1fonitot ing Well Construction Specifications and Surveyor Report <br /> Appendix C - Laboratory Repot i of Soil and Gtab Water 5atnples <br /> Advanced GeoEnveronmental Inc <br />