• <br /> Ms.Patricia Vellines 8188.001.002 <br /> The Trails of Manteca October 25, 2012 <br /> WORKPLAN FOR SOIL AND GROUNDWATER ASSESSMENT Page 4 <br /> REPORTING <br /> Following completion of the field investigation and subsequent laboratory analysis, a summary <br /> report will be prepared. The report will summarize the activities performed during the field <br /> investigation and the associated findings with respect to soil and groundwater conditions. The <br /> report will include an initial site conceptual model (SCM) based on the data collected to date. <br /> The SCM will include geologic cross sections, isoconcentration contours for groundwater <br /> impacts, and data table summarizing the known historical analytical data and the new analytical <br /> data collected from this assessment. <br /> SCHEDULE <br /> Once we receive approval of this workplan from RWQCB, the subsequent field and sampling <br /> activities will be scheduled to occur within approximately two weeks. It is anticipated that the <br /> fieldwork can be completed in two days and the characterization report will be delivered <br /> approximately two weeks after the laboratory data is received. <br /> We look forward to working with you on this project. If you have any questions regarding this <br /> workplan, please do not hesitate to contact us. <br /> Sincerely, <br /> ENGEO Incorporated QgOFES SIp �o NV DRO <br /> �FP��oZT JOHy �Fy�VdN M11 62 <br /> No. 78253 No. HG 413 <br /> * Exp.9/30/2013 * H TIFIED <br /> T CIV11- ?P ST Exp. 3/31/2013 <br /> Scott Johns, PE 9TFOF CA�Fo� awn Munger, CHG 4Tf of cAVF��a <br /> Project Engineer Principal <br /> Morga nson <br /> Environmental Scientist <br /> Attachments: Figure 1 —Vicinity Map <br /> Figure 2—Proposed Boring Locations <br />