Laserfiche WebLink
QUALITY ASSURANCE AND QUALITY CONTROL PLAN <br /> The Remedial Investigation (RI) Quality Assurance/Quality Control (QA/QC) program is intended <br /> to facilitate the acquisition of accurate and reliable data. Environmental data gathered during the RI <br /> will be collected and analyzed following procedures prescribed in the Quality Control Program. A <br /> Quality Assurance Program has been established to assure that the Quality Control Program is <br /> effective. Both programs are necessary to provide accurate data and documentation for <br /> investigations and laboratory analyses. The following field and laboratory procedures will be <br /> implemented to ensure that QA/QC objectives are met. <br /> 1.0 RECORDING OF FIELD DATA <br /> All information pertinent to the field investigation will be kept in a field log book/daily log. <br /> Information to be documented includes at least the following: <br /> - Sample numbers <br /> -Locations of sample collection <br /> - Soil boring or well numbers, as applicable <br /> - Depths at which samples were obtained <br /> -Names of collectors <br /> -Dates and times of collection <br /> -Purpose of sample <br /> - Sample distribution(e.g. laboratory, archive,etc.) <br /> -Field observations <br /> -Field measurements (e.g. PID readings,pH, conductivity,water levels.) <br /> - Other data records(e.g. development log, soil sampling report, well log,etc.) <br /> 2.0 SAMPLE CONTAINERS <br /> Groundwater samples will be placed in containers supplied by the analytical laboratory. Table 1 <br /> summarizes the required sample containers. Soil samples will be collected in either 8-ounce <br /> widemouth clear glass jars provided by the laboratory or in clean brass or stainless steel tubes <br /> (Table 1). Screw on caps will be fitted with Teflon liners. Tubes will tightly capped and sealed. <br /> GAData\GROUNDZE\QAQC\QAQC.doc <br />