My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:02:27 AM
Creation date
7/7/2020 10:50:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The sampling protocol described within the workplan only allows <br /> for selected TPH-G and D analysis of soil samples . Only one soil <br /> sample (highest TPH) is proposed for the BTEX constituents . <br /> PHS-EHD cautions that during the Problem Assessment/Site <br /> Characterization phase of investigation, adequate samples be <br /> analyzed so that both horizontal and vertical limits and the <br /> nature of the contamination can be determined. By only analyzing <br /> one soil sample per boring for BTEX, it is very possible that <br /> adequate data to define the limits of contamination will not be <br /> collected during this phase and additional data collection may be <br /> required in the future in order to evaluate any remediation plan. <br /> A site specific safety plan is required prior to the final <br /> approval of the workplan. Please include a map to the nearest <br /> emergency facility with the route highlighted. Phone numbers for <br /> the persons accepting twenty-four hour (24 hr) responsibility <br /> during this phase of well installation must be included in the <br /> safety plan also . <br /> Please submit separate boring permits for onsite and offsite work <br /> along with a separate $89 . 00 fee per application. Offsite/public <br /> property access agreements or encroachment permits are required <br /> prior to the issuance of PHS-EHD boring permits . Submit a copy of <br /> either along with your addendum to the workplan. <br /> Please direct your submittals, requests for field appointments, <br /> or any questions you may have to Michael Infurna at (209) 468- <br /> 3454 . <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> zg�-"_-e �; , <br /> Michael Infurna, enior REHS Diane M: Hinson, REHS <br /> Site Mitigation Unit Supervisor <br /> MI <br /> c : Sota - D. Murthy <br /> c : CVRWQCB - E . Thayer <br /> c : SWRCB Cleanup Fund - L . Bracco <br />
The URL can be used to link to this page
Your browser does not support the video tag.