My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:01:09 AM
Creation date
7/7/2020 10:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSU.YE CHECK LIST <br /> ® / <br /> SITE ADDRESS: t�'701 it/ b1-'dStA._ JA) 8/22/13 DATE: ?Z/? <br /> SITE NAME: (�-}�-� ,�, LOP STAFF: <br />? �7 REQUEST FOR CLOSURE(AKA NFA) uploaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> receives ESI with link to r g I tor's response in GT. If Staff verifies site meets LTCP closure criteria, then gain <br /> PG's concurrence. On 8 1 PG saved LTCP check list as "FINAL","READY FOR CLOSURE" in GT. <br /> �(a b LOP staff provides list of sites for PG to advise CVRWQCB of NFA considerations for Unit meeting preparation. <br /> 4* 51 I S LOP Staff request RP's consultant for GT submittals of Tri-Regional Appendix A; Time to reach WQG, initial & <br /> lr,�' removed mass residuals, radius of influence from remediation pilot study. RB notified on submittals in GT. <br /> 6t.� I 1 � LOP staff, PG/ PC discuss NFA and LTCP READY FOR CLOSURE consideration with CVRWQCB at Unit Meeting/ <br /> ���TT�"`"��� phone/email. RB concurs informally on . RB requires:t wAO to concur w/cl s re. <br /> 5 Aim' <br /> 31�Z Staff/consultant prepare Public Participation Notice (PPN). Staff approves final PPN for cdnsultant's uIti�ngg i <br /> listof effected properties and adjacent properties recipients (confidential) and PPN filed in LOP file. PPN uploaded <br /> to GT on z)&N PPN sent to city/county Building.Dept& water purveyor. <br /> Comment period of 60 days began 3 112 ; completed 5_& / ; #of Comments recorded in narrative <br /> LOP Staff directs RP to complete CERTIFICATION OF RECORD FEE TITLE OWNERS FOR PENDING"NO FURTHER <br /> ACTION REQUIRED"(RTO) form, per Section 25297.15 (a), if one is not in the file. Narrative to indicate Staff verified a <br /> completed RTO is in the LOP file. The NFA closure letter may not be issued without completion of RTO. <br /> 6/ LOP Staff drafts Case Closure Summary (CCS) and CCS is reviewed by 'third party' staff member. vm L 2G )�l <br /> LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA and final version of CCS. <br /> G-�LOP Staff submits 30-day CVR QCB letter dated �/ CCS nd file to PC for review and signature. <br /> Response due in 30 days by:W14//11 Concurrence received on:-tili ILIExtension requested to. <br /> Non-concurrence letter from VRW CB Management received on: <br /> Staff uploads EHD letter to CVRWQCB without CCS & CVRWQCB concurrence letter w/check sheet on to GT. <br /> -�^ LOP Staff directs RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> disposal. LOP staff reviews and approves work plan for MW destructions. Destruction permits issued <br /> (after 60 day PPN period) &Johnny notified of impending work. Destructions scheduled for <br /> LOP Staff verifies and documents in narrative the destruction of all MWs. GT"GW Monitoring Frequency" screen <br /> updated to indicate MWs are destroyed. The NFA may not be issued until MWs are destroyed. <br /> LOP Staff verifies and documents in narrative that all onsite waste material was removed and properly disposed, <br /> and EHD accounting staff verified that all SR & D site fees have been paid. The NFA may not be issued <br /> without this documentation. <br /> LOP Staff asks clerical to prepare NFA& CCS for Director's signature within 30 days of verifying destruction of <br /> all MWs and receiving documentation waste material was properly disposed. LOP Staff provides clerical the <br /> name and address of all RPs who are to receive an original NFA. <br /> PG/PC reviews NFA, CCS, and narratives for entries documenting all required steps are completed to approve <br /> issuance of NFA letter from the Director. File, NFA, & CCS returned to clerical for Director's signature. <br /> Signed CCS and NFA originals are mailed by clerical to RPs. Clerical distributes copies for LOP Staff to upload to <br /> GT, LOP File, & PC for their records. <br /> Clerical updates Envision records with PE 3528 and Manage Site Mitigation Case/ROP case status/ Closed. <br /> LOP staff pulls all site files for clerical staff to place in LOP Closed File cabinets, until scanned into Questy. <br /> LOP staff updates GT"Project Information" &"Status-Definition" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.