My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:01:09 AM
Creation date
7/7/2020 10:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br /> FOR U-HAUL SITE CLEANUP PROGRAM <br /> U-HAUL STORE #709-50 <br /> 2701 NORTH WILSON WAY <br /> STOCKTON, CALIFORNIA 95205 <br /> SAN JOAQUIN COUNTY SITE CODE: 1772 <br /> .July 9, 2007 <br /> U-Haul International/Amerco Real Estate Company (U-Haul) owns and occupies the property <br /> located at 2701 North Wilson Way in Stockton, California and currently uses the site as a U-Haul <br /> vehicle and equipment rental facility. The site was formerly used as a retail facility that operated <br /> four underground storage tanks that stored gasoline. Some of the gasoline tanks and dispenser <br /> piping leaked gasoline during operation and resulted in impacted soil and groundwater beneath <br /> the site. <br /> A program to clean the soil and groundwater beneath the U-Haul site is tentatively approved by <br /> the San Joaquin County Environmental Health Department, pending public notification. The <br /> cleanup program will consist of air injection as the groundwater cleanup method and air removal <br /> as the soil cleanup method. The groundwater cleanup will be accomplished by injecting air <br /> beneath the groundwater surface which will bubble its way upward through the water and strip <br /> out the leaked gasoline from the water. The soil cleanup will be accomplished by removing air <br /> containing gasoline vapors from the soil beneath the site and destroying the gasoline vapors <br /> inside a treatment system monitored by the Air Pollution Control District. The results of this <br /> cleanup program will be clean soil and groundwater beneath the site and clean air released to the <br /> atmosphere through the treatment system. <br /> The installation of the treatment system at the site will take an estimated six months. The <br /> treatment system will begin operation at the site in early 2008 and operate for an estimated 24 <br /> months following installation. All activities associated with the cleanup program will be confined <br /> to the U-Haul site and will not impact any neighboring properties (with the possible exception of <br /> intermittent construction noise during business hours while the treatment system is being <br /> installed). The site will continue to be operated as a U-Haul vehicle and equipment rental facility <br /> during and after the cleanup program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.