My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:01:09 AM
Creation date
7/7/2020 10:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/12/04 THU 14:43 FAX 517 349 5092 CLARI{ HILL lin002 <br /> 08/11/2004 13:02 6027286,,MW BLAES PAGE 02 <br /> CALIFORNIA WATIR SIRVICE COMPANY STOCKTOM DISTRICT <br /> 1330 W.FREMONT STREET • SU TE 100•STOCKTON,CA 05203.2660 <br /> 12091460-8971 •SAX(2091460-6155 <br /> July 27, 2004 <br /> Mt. Steve Woodhull <br /> Blanc Erivironmerltal <br /> 1433 North Third Avenue <br /> Phoenix, AZ 85003 <br /> VIA FACSIMILE: (602)728-0708 <br /> REe Installation of water facilities for the Frontier Motel, Stockmn, California <br /> Dear Mr. Woodhull: <br /> Our engineering department has estimated the Cost of the above project to be $21,144.00, <br /> including taxes, See attached sheet for detailed breakdown. This estimate is based upon <br /> current costs and maEerials, obtained through regular sources. Installation of water facilities will <br /> be after storm drain and sanitary sewers, but prior to other utilities or improvements such as <br /> street paving, sidewalks, driveways, etc. <br /> IF YOU WISH-TO COMPLETE THIS INS'I AI.LATION: <br /> • Remit payment of $20,804.00. (Your 04/28/03 deposit of$340.00 Inas been deducted from <br /> the total). <br /> • Agreement —To prepare an agreement, please complete the attached form and return to <br /> CWS. The agreement must be prepared, signed and returned prior to start of construction. <br /> See attached Rulc 15 for details. <br /> • We will schedule work crews as soon as the above items are received. <br /> This estimate is submitted as preliminary information only. The figures and informad8n <br /> contained herein are subject to execution of an agreement within 30 days of this date. <br /> Following completion of the projccr and determination of the final cost, any remaining funds <br /> will be returned to you, or if additional funds are requited, they will be requested of you. <br /> VAFnW"nrw W&, AMTEtopE VALLEY •LKfL L1lElD 04714-.9-VAN au,C„•4111<0 bIION EALT lqJ Aotu%•FERN xwtl VAl1EV•LfMO UTI <br /> 1!'I�l,�OIIt-IOL 1.170/-M�LtLVilll.OlC1 V111E L�NGMo 00+•.1+9 VCi•stow OOLI VAltl7-LAU%"•Ltlt»A•1TocL,n"•v%l •wILTLAKi-1•U/ L <br /> 08/11/04 WED 15:53 [TX/RX No 66541 X1002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.