Laserfiche WebLink
08/12/04 THU 14:44 FAX 517 5092 CLARK HILL 2007 <br /> 08/11/2004 13:02 602726.`, BLAES PAGE 07 <br /> Page 1 of 2 <br /> Blass Enviormental <br /> To: Adrienne 511saesser[EH] <br /> Cc: Margaret Lagorio(EH]; Mike Infurna [EH] <br /> Subject: RE: Frontier Motel <br /> Adrienne, <br /> Here is a brief summary of the progress toward connecting Frontier Motel to city water: A revised cost estimate <br /> was required by Cal Water since the previous estimate had expired. The revised estimate was requested on May <br /> 19, 2004 and received on July 27, 2004, The new required deposit of$20,804 and an agreement request form <br /> was submitted to California Water Service on August 10, 2004 by 61aes Environemental on behalf of U-Haul(Cal <br /> Water Project*STK0008655). Regina Coe of Cal Water stated that construction on the main line extension will <br /> most likely begin In f❑ur to five weeks_ 131aes Environmental has lined up a contractor and is ready to finish <br /> installation of the water service from the Cal Water's water meter to the Frontier Motel as soon as the main line <br /> eXtension is complete. The carbon system will be removed a5 soon as Frontier Motel Is connected to city water. <br /> The new carbon for the change-out was delivered to the site on Monday the 9th. 1 he carbon change out has <br /> boon scheduled with Tom of Quality Service and Mike of FGL Labs for their soonest availability (late this week <br /> unless there is a cancellation in their existing schedule). Please let me know if you have any additional questlons <br /> or concerns. <br /> Thank You, <br /> Steve <br /> Blaes Environmental <br /> -----Original Message----- <br /> From: Adrienne Ellsaesser [EH] [mallto:AEllsaesser@sjcehd.com] <br /> Sent: Monday, August 02, 2004 1;56 PM <br /> To: b1aes1@mindspring.cam <br /> Cc: Margaret Lagorio (EHJ; Mike Infurna (EH] <br /> Subject- RE: Frontier Motel <br /> Dan, <br /> 6y 912004, We have required Frontier Motel to be connected to Cal Water large public water system or a <br /> new GAC treatment system is to be installed. I need the engineered plans ASAP for approval to have the <br /> installation online by Sept, if this the option that will be taken. Please update me on this Site and when will <br /> the GAG be changed out at the existing treatment system. <br /> Thank you Adrienne <br /> -----Original Message-- - <br /> From: Mike Ostrom [mallt:o:mlkeo@fglinc.[om] <br /> Sent: Monday, August 02, 2004 9:25 AM <br /> To: blaesl@mindspring.com <br /> Ce: Adrienne Ellsaesser [EH]; Willy Ng (EH]; Tom McCoy <br /> Subject; Frontier Motel <br /> Dan: <br /> It is time to change out the carbon again. Please advise_ <br /> Alto Filters ND <br /> Between filter 0.7 ug/L 1,2 DCA <br /> Well 2.6 ug/L 1,2-DCA <br /> 8/10/2004 <br /> 08/11/04 WED 15:50 [TX/RX NO 66541 Z007 <br />