Laserfiche WebLink
Em <br /> 5.0 SCHEDULE <br /> E� ETS anticipates that the field work will take three to five <br /> working days in the field, and can begin within four weeks of <br /> authorization to proceed from The San Joaquin County Environmental <br /> Health Department. <br /> This time schedule includes the installation of four <br /> monitoring wells, well development, groundwater sampling, three to <br /> six soil borings, soil logging, and soil sampling. <br /> 6.0 RE14ARKS AND SIGNATURES <br /> This Workplan has been <br /> p prepared using standard industry <br /> practices, and represents ETS ENVIRONMENTAL's professional <br /> re <br /> opinion as to the amount of work required to achieve the desired <br /> f� <br /> goal of this investigation. All work is to be conducted in a <br /> F � <br /> professional manner according to the protocol attached as <br /> t_e Appendix B. <br /> ETS ENVIRONMENTAL is not responsible for undisclosed <br /> (, site information or conditions. <br /> ETS ENVIRONMENTAL & ASSOC. <br /> s PROJECT No. 305, PAGE 6 <br /> t'a <br /> j ; <br /> k� <br />