My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012664
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0012664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:02:37 AM
Creation date
7/7/2020 10:57:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012664
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in which sample recovery is not possible. <br /> The soil samples will be collected using a cr.lifornia <br /> Modified split-spoon sampler with brass liners. The sampler <br /> will be driven by a 14o-pound hammer repeatedly falling 30 <br /> inches (ASTM Standard 1586) . <br /> µ The laboratory samples will not have head-space and will <br /> be immediately sealed in their liners using aluminum foil-- <br /> lined plastic caps taped in place. The remaining sample will <br /> be removed from its liner to be used for sieve analysis, if <br /> appropriate, and to aid the on-site geologist in logging the <br /> material. <br /> n GROUNDWATER SAMPLING <br /> a All sampling equipment, including the pump, bailer and <br /> cables will be disassembled, if appropriate, and steam- <br /> cleaned prior to commencement of samplLig. These procedures <br /> will also be followed between each well or sampling point and <br /> at the end of the sampling day. De-ionized or organic--free <br /> water will then be introduced into the pump (or bailer) as <br /> the last stages of cleaning prior to the taking of each <br /> sample. <br /> Immediately prior to sampling, water levels and well <br /> depth measurements will be taken in all wells at the site. <br /> Each well will be evacuated using a Teflon bladder pump or a <br /> Teflon bailer. At least three well volumes will be evacuated <br /> from the wells. - -- --- - <br /> Parameters of the water condition will be measured and <br /> PAGE 5 <br /> is <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.