Laserfiche WebLink
x INSTALL MONITORING WELLS <br /> OTHER (SPECIFY) : <br /> 1C. RISK ANALYSIS , <br /> 1. TASKS PLANNED (REVIEW AND ATTACH TASK RISK ANALYSIS <br /> AND HEALTH AND SAFETY PhAN) <br /> N UNDERGROUND TANK TESTING TANK INSTALLATICN <br /> UNDERGROUND TANK REMOVALS � CONFINED SPACE <br /> ENTRIES <br /> �L DRILLING/SOIL WATER INITIAL SITE ENTRY <br /> INVESTIGATION <br /> X SOURCE INVESTIGATION/ DRUM SAMPLING <br /> AUGER DRILLING <br /> EXCAVATION TREATMENT SYSTEM <br /> OTHER OTHER <br /> 2. HAZARDOUS MATERIALS ANT'ICIPATE'D (BASED ON REVIEW OF <br /> SITE HISTORY, PRELIMINARY MONITORING: AND OTHER <br /> OESERVATZONS) . <br /> SOURCE: Lia}zing underground storage tank <br /> CONTAMINANT: Hydrocarbons, (leaded gasoline) <br /> CONCENTRATION AT SOURCE: 3,100 ppm <br /> COMMENT, <br /> r.. 3. OTHER POTENTIAL HAZARDS: <br /> RADIOACTIV7 MATERIALS UNKNOWN HAZARDOUS <br /> SUBSTANCES ANTICIPATED <br /> ° OXIDIZERS/REACTIVE CONFINED SPACES/ <br /> MATERIALS INADEQUATE VENTING <br /> x DUST X NOISE (SOURCE) : Drill rig. <br /> FLAMHABLES HAZARDS DUE TO ADJACENT <br /> NON-PROJECT WORK <br /> # (SPECIFY: <br /> ' HEAT STRESS (AVERAGE <br /> DAYTIME TEMPERATURE <br /> � . DEGREES _,F) INFECTIOUS AGENTS <br />