Laserfiche WebLink
i <br /> FOLLOWING !TANNER. <br /> PERSONNEL ENTRY CONTROLS: All personnel will enter <br /> the site with proper safety protection. ` <br /> PERSONAL LOGGING PROCEDURES: <br /> WARHINGS/OTHER PHYSICAL BARRIERS: Site will be <br /> cordoned off with traffic cones and tape, <br /> E2. LOCATION OF THE ON-SITE COMMAND POST (IF APPLICABLE, <br /> INSURE THAT IT IS LOCATED UPWIND FROM SOURCES, GIVEN <br /> PREVAILING WINDS) <br /> T- E3. IT WILL WILL NOT R BE NECESSARY TO <br /> ESTABLISH d1N EXCLUSION ZONE ANDAND OTHER ZONE <br /> BOUNDARIES? IF 'oyEa,,, DESCRIBE BOUNDARIES OR ATTACH <br /> A MAP OF CONTROLLED AREAS. <br /> LEVEL OF PROTECTION <br /> EXCLUSION ZONE A B C <br /> CONTAMINATION REDUCTION ZONE A B C <br /> SUPPORT ZONE NOT APPLICABLE <br /> i <br /> E4. DECONTTAMINATION PROCEDURES: <br /> SPECIFIC CONTAMINATION PROCEDURES ARE NOT <br /> APPLICABLE. <br /> X SOILED PROTECTIVE CLOTHING AND EQUIPMENT WILL BE <br /> DISPOSED OF OR CLEANED WITH DETERGENT WATER UPON <br /> LEAVING THE WORK AREA: (SEE GENERAL HEALTH AND <br /> SAFETY PLAN) <br /> SPECIFIC DECONTAMINATION PROCEDURES ARE REQUIRED: <br /> EMERGENCY DECONTAMINATION WILL OCCUR AT: <br /> THE FOLL044INE2 DECONTAMINATION EQUIPMENT/PROCEDURES <br /> WILL BE USED <br /> £5. HAZARDOUS WASTE MANAGEMENT AND SPILL CONTROL <br /> X THIS PROJECT WILL GENERATE HAZARDOUS WASTES WHICH <br /> RILL BE: <br /> R STORED <br /> 7 <br />