My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2020 12:57:37 PM
Creation date
7/7/2020 1:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? 10 <br /> (Check all that apply.) Simulated leak rate verified: Q 3 GPH El 0.1 GPH E] 0.2 GPH El El <br /> Was the testing apparatus properly calibrated? 0 ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? V, ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ 0 <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑ ❑ ✓❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ Q <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ 0 <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? n ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? 0 ❑ ❑ <br /> For any answer of"N"above, descrlbe in Section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM 1 PRESSURE 1 HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ✓❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space ❑Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑No (Describe the reason in section XV below.) <br /> For any answer of"Fail"above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Nat Applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.