Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page a of s) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section) Y N P!A <br /> This section must be completed ifLLDs are installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified ❑X 3 GPH ❑ 0.1 GPH ❑0 2 GPH <br /> Was the testing apparatus properly calibrated? O ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ X❑ <br /> For mechanical LLDs.does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ ❑X <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? Q ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑X ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑X ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑X ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? FE <br /> ❑ El <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ <br /> For any answer of"N"above,describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM I PRESSURE i HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Q Check this box if VPH monitoring is NOT used. (Do not complele this section.) <br /> This section must be completed if VPN monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure r]Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑Pass ❑Fail ❑Pass ❑Fad <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fait ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail 0 Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space ❑Visual inspection <br /> ❑Other(Describe the method in section XV below) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces'? ❑Yes ❑No(Describe Me reason in section XV below) <br /> For any answer of"Fail"above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Galou Per Hour Y=Yes N=No NA=Not Applicable VPH=VacutmPressuT-Iydrostatc,ID=1dertficaton <br />