Laserfiche WebLink
i B1aeS Environmental Management Inc 3rd Qtr 2004 Groundwater Monitoring Report <br /> 002-70950 04 U-Haul#709-50 <br /> 5.0 PLANNED ACTIVITIES <br /> Blaes Environmental will continue quarterly groundwater monitoring activities at the site Additional <br /> characterization activities are also scheduled for the first quarter of 2005 The scope of work consists of <br /> additional soil borings using CPT and the installation of additional groundwater monitoring wells to fully <br /> define the extent of hydrocarbons in saturated soil and the lateral extent of hydrocarbons in groundwater <br /> at the site The additional characterization activities will be detailed in a separate letter to follow this <br /> report <br /> i - <br /> 1 <br /> 1 <br /> i <br /> 13 <br />