My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 3:01:51 PM
Creation date
7/7/2020 2:11:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Brine sens isa"high liquid"alarm activated with sensor upside down? r YES r NO <br /> If No, provide additional information: <br /> 8. During checkout, did a Ryder Representative confirm that all communication is YES NO <br /> functioning properly? <br /> If No, provide additional information: <br /> 9. Isthe overfill alarm visible and audible at the tank fill point(s)and operating properly at 900/o? (If the HLAisnot <br /> programmed to activate at 90°/9 select N/A and note below) <br /> YES (- NO r. N/A <br /> If No or N/A, provide additional information:tanks have flappers <br /> 10. Isthe overfill alarm visible and audible at the tank fill point(s)and operating properly at 950/o? (If theHLAisnot <br /> programmed to activate at 95%select N/A and note below) <br /> YES (- NO r. N/A <br /> If No or N/A, provide additional information: <br /> In—Tank Gauging/Probe: <br /> 1. Hasall wiring been inspected for proper entry and termination, including testing for ground vaults? (visual <br /> inspection without disassembly of Jbox seal off,or use of mega ohm meter etc) <br /> YES r NO <br /> If No, provide additional information: <br /> 2. Any signs of cracking and swelling on tank gauge probes? r. YES r NO <br /> If yes, describe signs: <br /> WO# 2335977 <br />
The URL can be used to link to this page
Your browser does not support the video tag.