Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following <br /> equipment, if installed: 1) monitoring system control panels;2) in-tank liquid level probes(if used for leak detection); 3) devices <br /> monitoring tank annular spaces or vault;4) devices monitoring product piping;5) devices monitoring fill piping; 6) devices monitoring vent <br /> piping; 7)devices monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps;9) devices monitoring under-dispenser <br /> containment; 10)line leak detectors;and 11) devices monitoring any other secondary containment areas. <br /> V.R. <br /> ALL SUMPS AND UDC ARE ALL TANKS HAVE 303 <br /> DOUBLE WALL SUMP5 W/ ANNULAR SENSORS <br /> 208 SUMP SENSORS AND 304 <br /> I NTERSTIAL SPACE SENSORS. <br /> BUILDING O <br /> VENT SUMP <br /> Laeand <br /> FO nll ®rillrvaPm VP P a_.o <br /> *O4 ,u,omrta„n4Gw„ O nnn,ltl, ®New.._., <br /> L, -P <br /> DIESEL 1 DI ESE L 2 <br /> 610 DIESEL <br /> RIO DIESEL BLEND/PIPING <br /> SUMP <br /> OSTP STp O <br /> � <br /> rnrn� T O <br /> {I]l �/ (Ij V AW0. <br /> ilwII 118 ilwl II tib <br /> lIIIIITI�II`_'T lJIIIrIIII�'l�, IIIIITI�II', O <br /> W 5R1 W SFT W15AT <br /> TIT <L— <br /> (D pSnIInIII <br /> W O <br /> ESO � <br /> p p O <br /> M M p <br /> O <br /> O � � <br /> O STP <br /> DEE <br />