My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007135
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0007135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 3:10:41 PM
Creation date
7/7/2020 2:20:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007135
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> PROJECT NUMBER 002-70950-03 BORING 1 WELL NO ASW-1 <br /> PROJECT NAME U-Haul#709-50 TOP OF CASING ELEV Pending <br /> WOCATION 2701 N Wilson Way GROUND SURFACE ELEV Pending <br /> Stockton, CA DATUM Pending <br /> WELL PERMIT NO Pending INSTALLATION DATE 4/8/2002 <br /> Tramc Rated Vault EXPLORATORY BORING <br /> g <br /> a Total depth 80 0 ft <br /> b Diameter 6 114 in <br /> Drilling method Hollow-Stem Auger <br /> WELL CONSTRUCTION <br /> c Total casing length 78 5 ft <br /> Material Poly-Vlnylch_loride <br /> I1 d Casing Diameter 1 114 in € <br /> e Depth to top of screen B9 ft <br /> f Screen Interval loft @ 69 -79 ft <br /> e Perforation type Machine slot <br /> 17,,7 Perforation size 0 010-inch <br /> g Surface Completion 1 0 ft <br /> Completion Material Concrete <br /> h Surface Seal 64 ft <br /> Seal material Neat Cement Grout <br /> a i Seal 2 ft@ 65-67 ft <br /> I Seal material Bentonite Pellets <br /> Sand Pack interval 12 ft @ 67- 79 ft <br /> Pack material #2 - 12 Sand <br /> k Bottom seal 1 ft <br /> I Seal material <br /> f Slough <br /> — <br /> I Depth to groundwater 87 ft <br /> below ground surface <br /> Sk ,� �w <br /> �#r..I ES Environmental Management Inc <br /> a---b ---► <br /> --I. d Typical Well Vault AS Well Construction Diagram Figure <br /> U-Haul Internapon <br /> U Haul#709-50 <br /> ire ' t 2701 N Wilson Way <br /> Alk <br /> pared by Date �y Stockton,ca <br /> Project No 002 70950 03File CJ2001luhaul1709501well1 i01 <br /> Reviewed by Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.