Laserfiche WebLink
BLL- Ef En,ironmeniat Management Inc I GROUNDWATER SAMPLING FORM <br /> I433\with Third kticnuc �� <br /> ilwmix %nuuna M03 Well No 1 C- <br /> 2 728 0707 <br /> Well Type ■ Monitor El Remedial -VE AS <br /> Ite ID U-Haul #709-50 ❑ other <br /> Project No 042-74950-03 Well Material i PVC ❑ St Steel <br /> Recorded By M Hilstrom ❑ Other <br /> WELL PURGING <br /> Purge Volume Purge Date purge Method I <br /> Casing Diameter(D)in Inches - -Z y' <br /> ❑ 2-Inch 4-Inch ❑ 8-inch ❑ Other � Boller-Type /C��' <br /> ❑ Submersible ❑ Whale <br /> Total Depth of Casing (TD in feet BTOC) -&4:� 6-' ❑ Other <br /> Water Level Depth(WL in feet BTOC) q-1-o-q q-1-o- _ IF Intake Setting j <br /> Number of Well Volumes (#Vols)to be Purged <br /> hn El Near Bottom ❑ Near Top El Other <br /> 3 [:] 4 ❑ 5 ❑ Other Depth ,n feet(STOC) <br /> Purge Volume Calulation Screen Interval In Feet(BTOC) from <br /> t ) 2 to <br /> X X - X 00409 = 7 z- gallons <br /> TD(feet) WL(feet) D(inches) #Vols Calculated Purge Volume <br /> Pump Time I Purge Rate _ Actual Purge Volume <br /> Start Stop IG�7 Time Elapsed Initial Qpm j gallons <br /> qpm <br /> Field Parameter Measurements i nal <br /> Time Time Lapsed <br /> GallonTemp Notes <br /> s Cord i Cond 2 I i <br /> Purged (umhoslcm) ; <br />