Laserfiche WebLink
PROJECT NUMBER 002-70950-03 BORING 1 WELL NO ASWA <br /> PROJECT NAME U-Haul#709-50 TOP OF CASING ELEV Pending <br /> LOCATION 2701 N Wilson Way GROUND SURFACE ELEV Pending <br /> Stockton,CA DATUM Pending <br /> WELL PERMIT NO Pending INSTALLATION DATE Pending <br /> Traffic Raced Vault EXPLORATORY BORING <br /> g <br /> a Total depth 800 ft <br /> b Diameter 6 114 in <br /> Drilling method Hollow-Stem Auger <br /> WELL CONSTRUCTION <br /> c Total casing length 79 5 ft <br /> Material Poi -Vin (chloride <br /> h d Casing Diameter 1 112 In <br /> e Depth to top of screen 70 ft <br /> f Screen Interval 10 ft @ 70- 80 ft <br /> e Perforation type Machine slot <br /> I - Perforation size 0 010-inch <br /> g Surface Completion 10 ft <br /> Completion Material Concrete <br /> h Surface Seal 62 ft <br /> Seal material Neat Cement Grout <br /> tI Seal 5 ft @ 68- 63 ft <br /> a <br /> I Seal material Bentonite Grout <br /> Sand Pack Interval 12 ft @ 68 -80 ft <br /> Pack material 10 -20 Sand or Equivalent <br /> k Bottom seal --- ft <br /> 1 Seal material None <br /> f — I <br /> Depth to groundwater 57 ft <br /> = below ground surface <br /> � k w <br /> BLAES Environmentai Management,Inc <br /> Figure <br /> Typical Wel!Vault <br /> AS Well Construction Diagram <br /> � �.._ <br /> U Haul Internation <br /> U-Haul#709-50 <br /> 2701 N Wilson Way <br /> Prepared by Date Stockton,CA <br /> Project No 002 70950 03 File C 120011uhauV709501propwells <br /> Reviewed by Date <br />