My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007151
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0007151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 3:01:55 PM
Creation date
7/7/2020 2:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007151
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blaen Environmental Management Inc U-Haul4709-50 <br /> 002-70950-03 Work Plan <br /> 11/8/01 <br /> The target depths for VE testing will include the upper zone (5-30 feet bgs) and lower zone (30-55 feet <br /> bgs) of hydrocarbon impact to the recent depth of groundwater The proposed VE test well is designed to <br /> test each of these depth zones separately As a result, the VE well will be constructed of two 2-inch FVC <br /> casings, screened at separate depth intervals (10-30 feet bgs and 35-55 feet bgs) within the same borehole <br /> A licensed drilling company will drill and install the VE well using a hollow-stem auger drill rig The VE <br /> well will be installed with 6 25-inch internal diameter (ID) auger to a total depth of 55 feet bgs The <br /> screened casing will have 0 020-inch slots The sand pack surrounding the screen will consist of 8-12 <br /> mesh sand or equivalent The VE well will be completed,lust below grade, capped with a lock plug, and <br /> secured with a flush-mounted traffic-rated 12-inch well vault The well construction diagram of the <br /> proposed VE test well is included as Figure 14 <br /> 4 2 2 AS Well Construction <br /> One AS well is planned for installation prior to testing The planned AS well will be located <br /> approximately 10 feet west of the VE well location (Figure 13) The purpose of placing the AS well near <br /> the VE well is to use the VE well to capture sparge air In addition, the VE well will be used to monitor <br /> the effects of AS testing <br /> The proposed AS well will be drilled and installed by a licensed drilling company The AS well will be <br /> installed according to the well construction diagram included as Figure 15 Using a hollow-stem auger <br /> drill rig, the AS well will be installed with 4 25-inch ID auger to a total depth of 80 feet bgs The well <br /> will consist of 1 5-inch ID PVC casing with 0 01-inch slots (screened interval) at approximately 70 to 80 <br /> feet bgs A 10-20 mesh sand or equivalent will be used as the sand pack opposite the screened interval <br /> The AS well will be completed dust below grade, capped with a lock plug, and secured with a flush- <br /> mounted traffic-rated 12-inch well vault <br /> During and upon installation of the AS well, Blaes Environmental will direct the drilling contractor to <br /> develop the well Well development activities will follow those described in Section 3 14 <br /> 4 2 3 Investigative Waste <br /> Drill cuttings generated during remedial well installation will be containerized in approximately nine <br /> Department of Transportation (DOT) approved 55-gallon steel drums and stored on-site pending proper <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.