Laserfiche WebLink
1 <br /> BEI FIELD LOG OF Project No 002-7095Q-01 Boring No <br />' Client U-Rauf Intel i n I_ DP-1 <br /> EXPLORATORY BORING Location 2ZQ1 N Wilson Way <br /> Logged By McDaniel an D Sheet 2 <br /> Of 2 <br /> j+ld location of boring Drilling Co Precision Drilling <br /> Drill ng model <br /> See Figure 4 Drilling Method Direct Push <br />' Hole Diameter 1 114-inch <br /> Bonng completion data Bentonite rout <br /> Ground Elev Tremied from total depth to surface Surface capped with asphalt <br />' Depth to V Depth to V <br /> CL <br /> a� N w a' g' $' Time Time <br /> C J <br /> o _ o oY� Date Date <br /> co <br /> ca 0 y p R <br />' DESCRIPTION <br /> 31 <br /> 40 <br /> I <br /> s0 <br /> so <br /> I <br /> fig Sandy Clay (CL), Dark Olive, med plastic, damp/moist <br /> 1200 DP-1-70 70 CL Strong hydrocarbon-like odor <br /> I1200 DP-1-71 71 ----- ------------------------------------ <br /> GC Clayey Gravel (GC), 70% fine gravel (sub-rounded), <br /> 30% clay, very dense, dry Strong hydrocarbon-like <br /> 1330 3" DP-1-80 80 odor <br /> 81 <br /> Rain began fallen at 13 30 Poor sample recovery at <br /> 84 80' Broken tip inhibited sampler <br /> Refusal reached at 84' Discussed alternatives with Percision I <br /> called M Infurna re use of auger He authorized auger Precision <br /> wants to try another hole with larger diameter piping <br /> r Reviewed By Date ' � &,D <br /> II i tnan%709-50 OP1 Z70950190P 12 February 08 2000 <br />