Laserfiche WebLink
U-Haul#704-50 <br /> Stockton,California SO;7'd <br /> Environmental Technology, Inc <br /> ' Groundwater samples collected during the September 1997 monitoring event were submitted in <br /> good condition, with appropriate chain-of-custody documentation, to Columbia Analytical (Colton, <br /> CA) for analysis Each of the samples were analyzed for the following constituents, <br /> • Total petroleum hydrocarbons as gasoline (TPH-g), by the DHS-TPH method (modified <br /> ' EPA method 8015), <br /> • Benzene, toluene, ethylbenzene, and xylenes (BTEX) by modified EPA method 8020, and <br /> ' • Volatile organic compounds by modified EPA method 8260, including the oxygenated <br /> compounds specified in the memo dated September 25, 1997 by San Joaquin County Public <br /> Health Services, Environmental Health Division (PHS/EHD) <br /> ' The groundwater sample analytical results revealed detectable TPH-g and/or BTEX concentrations <br /> in samples from all of the wells except MW-8, with the greatest concentrations reported in the <br /> sample from MW-4 In general, the data indicate a marginal decrease in contaminant <br /> concentrations for well MW-2 samples and a slight increase in contaminant concentrations for <br /> wells MW-3, MW-4, and MW-6 samples in comparison with the September 1996 analytical <br /> results <br /> ' The accumulated laboratory results are summarized in Table 2 and the current analytical results are <br /> presented in Figure 3, along with a groundwater benzene isoconcentration contour map None of <br /> the groundwater samples revealed detectable concentrations of the oxygenated compounds listed in <br /> the PHS/EHD memo by EPA method 8260, although relatively minor concentrations of several <br /> halogenated volatile organics were detected A summary of the EPA 8260 analytical results is <br /> presented in Table 3 A copy of the laboratory report and chain-of-custody documentation are <br /> attached <br /> SOTA is currently in the process of preparing a Remedial Action Plan (RAP) to mitigate residual <br /> gasoline contamination in soil and groundwater at the site under contract with UHI We estimate <br /> that the RAP will be completed within 30 days, and a copy submitted to PHS/EHD for review and <br /> comment prior to implementation <br />' If you have any questions or comments regarding this case, please contact our office at your earliest <br /> convenience We appreciate your cooperation in this matter <br />' Sincerely, <br /> SOTA Environmental Technology, Inc. <br /> Dakshana Murthy, Ph D , P E •� <br />' Project Manager <br /> cc Reid Reiner9�aF ONA0t.1V�4���. <br /> U-Haul International,Inc <br /> 2721 N Central Avenue <br /> Phoenix, AZ 85004 <br /> 2 <br />