Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILI/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes i <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X "See comments below <br /> Test Method Developed By: '..I Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> I Other(Specify) <br /> Test Method Used: i Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,). <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Teat Reault:. <br /> Comments—(include information on pa' maae Lrlor 10 testing,and recommended follow-up for failed Isms) <br /> •SpdVOverfll Containment Boxes tested annually with,Monitoring System Certification. <br />