Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? Eil ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, 0 ❑ ❑ <br /> functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their 0 ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? 01 ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? 0 ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically El 11disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? O ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) F1 Sump ❑Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? I El I ❑ ❑ <br /> For any answer of"N"above,describe in section/X how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Dispensers are equipped with chains and floats only. <br /> X. IN-TANK GAUGING TESTING <br /> ■ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed.(Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination,including testing for ground El Elfaults? <br /> El Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally tested, 0 El Eland confirmed operational? <br /> Was accuracy of system's product level readings tested? 0 ❑ ❑ <br /> Was accuracy of system's water level readings tested? El ❑ ❑ <br /> Were all probes reinstalled properly? El ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? 0 ❑ ❑ <br /> For any answer of"N"above,describe in section X/how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Probes were tested <br /> Y=Yes,N=No,NA=Not Applicable <br />