My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007244
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2701
>
3500 - Local Oversight Program
>
PR0540315
>
ARCHIVED REPORTS_XR0007244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 3:00:45 PM
Creation date
7/7/2020 2:48:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007244
RECORD_ID
PR0540315
PE
3526
FACILITY_ID
FA0023046
FACILITY_NAME
U-HAUL FACILITY NO 710050
STREET_NUMBER
2701
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95215
APN
11708014
CURRENT_STATUS
01
SITE_LOCATION
2701 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Blaes Environmental Management Inc U-Haul#709-50 <br /> 002-70950-04 <br /> Groundwater Monitoring Report <br /> 01/23/03 <br /> ' 1 3 PROJECT STATUS <br /> In November 2001, Blaes Environmental submitted a work plan to the SJCEHD detailing proposed work <br /> for the site The work plan proposed the Installation of three new monitoring wells to further evaluate <br /> the extent of hydrocarbons In groundwater to the east, west, and south of the site <br /> 1 <br /> Two remedial test wells (one air sparge, and one nested vapor extraction well) were Installed near the <br /> westernmost former dispenser Island Following the Installation of the additional wells, remedial <br /> feasibility studies were conducted that Included a vapor extraction and air sparge test, an aquifer pump <br /> ' test, and a blofeas>bllity analysis of the soil and groundwater The results of the remedial feasibility <br /> studies are to be presented in a separate remedial test report <br /> 14 PROGRAM OBJECTIVES <br /> The objective of the quarterly groundwater monitoring program Is to provide additional monitoring and <br /> analytical data to further evaluate groundwater conditions beneath the site <br /> 15 SCOPE OF WORK <br /> The current quarterly monitoring event was conducted in September 2002 The monitoring event <br /> Involved the following tasks 1) collecting field measurements of groundwater conditions from all of the <br /> well casings In each of the well locations, 2) purging monitoring wells prior to collecting groundwater <br /> samples, 3) storing and profiling purged groundwater for disposal/treatment, 4) analyzing groundwater <br /> 1 samples, and 5)the preparation of this report <br />' 1 6 PROJECT TEAM <br /> The project team consisted of Blaes Environmental of Phoenix, Arizona, and Del Mar Analytical, Inc <br /> (Del Mar), a California State certified analytical laboratory located In Irvine, California <br /> • 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.