Laserfiche WebLink
B[aes Environmental Management Inc U-Haul#709 50 <br /> 002-70950-04 Groundwater Monitoring Report <br /> 01/23/03 <br /> Wells at the site are now screened across three depth intervals These depth intervals include r" <br /> • p p m ude the !owe <br /> (C) well casings screened at depths ranging from approximately 60 to 100 feet below ground surface <br /> (bgs), the "middle" (B) well casings screened at depths ranging from approximately 45 to 77 feet bgs, <br /> and the "upper" (A) well casings screened at depths ranging from approximately 23 to 62 feet bgs <br /> These screened intervals accommodate fluctuations in groundwater depth that have ranged from <br /> approximately 45 to 90 feet bgs since 1993 (SOTA, 1997) Monitor well construction information is <br /> summarized in Table 1 On April 8 - 10, 2002, Blaes Environmental installed three new wells at the site <br /> These wells included two remedial test wells (ASW-1 and VEW-1/2)and a groundwater monitoring well <br /> (MW-10) (Figure 2) The well construction diagrams for these wells were presented in the Second <br /> Quarter 2002 Groundwater Monitoring Program Report, prepared by Blaes Environmental and submitted <br /> rto U-Haul and the S7CEHD on September 30, 2002 <br /> 1 <br /> 1 <br /> 5 <br />