Laserfiche WebLink
= OP nuW. C <br /> ,G2 SAN J OAQ U I N Environmental Health Department <br /> .. _.. <br /> . <br /> COUNTY Wayne Fox, REHS , Interim Director <br /> c . . .iFoGreatness grows <br /> here . PROGRAM COORDINATORS <br /> gCa� <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Michael Kith , REHS <br /> Melissa Nissim , REHS <br /> September 23 , 2020 <br /> Megan Mitchell <br /> Elite IV Contractors <br /> 2535 Wigwam Dr <br /> Stockton , Ca 95205 <br /> Re : EI Dorado Gas & Mart SR0082592 <br /> 1605 S . EI Dorado St <br /> Stockton , Ca 95206 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to do the following on the underground storage tank ( UST) system at <br /> the above noted address : <br /> • Install new dispensers with conversion frames <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to usfi sigov . org to arrange the following appointments ( a <br /> 48 - hour notice is required for inspection appointments ) . <br /> a . Verification of the dispenser footprints contained by the under dispenser <br /> containment sumps ( UDCs ) . Any potential leaks from piping and fuel filters must <br /> drain directly into UDCs . <br /> b . Visual inspection of the piping within the dispensers for any leaks . <br /> c . Verification of the installation of the conversion frames per manufacturer' s <br /> instructions . <br /> d . If concrete will be broken near the tanks , piping , or sumps a secondary <br /> containment test must be performed on the affected components once concrete <br /> is poured in accordance with the manufacturer' s guidelines , and test results <br /> submitted to the EHD within 30 days of testing . <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible <br /> valid , current contractor' s licenses issued by the Contractors State License Board <br /> ( may be issued to the installation company) , or a Tank Tester' s license issued to the <br /> individual by the State Water Board <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 I F 209 464-0138 1 www . sjgov . org/ehd <br />