My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 8:39:32 AM
Creation date
7/7/2020 3:41:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />Monitoring System Certification <br />U ST UDnito-ring Site Plan <br />UST MONITORING SITE PLAN <br />SAN JGACLUIN COUNTY JAIL <br />70M MICHAEL CAN LIS BLVD, FRENCH CAMP, CA 95231 <br />N <br />we <br />ti <br />ORTHD51L T_--'%{ <br />BOILER ROOM <br />INVENTORY <br />PROBE ROBE � <br />SLT v SENSOR op%r 31�-3 221-1 <br />PIPING, <br />�i ARNUL.ARSENSORDPW30-3223 <br />PIPING <br />GEAERA TOR <br />AT <br />ANtdLIL-AR SENSOR DPW 3-0-3223 <br />A <br />3TMP SENSOR DPA- 30-322I-1 <br />P <br />KEY <br />A - ANNULAR <br />FILL B - BRDIE. SENSOR <br />C - FLOATS & CI -Lk S <br />50UM R3L TANK F - FILL <br />L -PLLD <br />X1 - MANWAY <br />P- PROBE <br />5 - STP <br />T- TURHLNE <br />V - VAPOR <br />X - SMV P SENSOR <br />Date map was dravm: 11-17-2017 <br />Instructions <br />11 you already have a diagram that shows a9 required <br />information. you rray include r1, rather than this page, with your Monitoring 5ystam Certiru,,st on. On yoursrte plan, <br />shorn Me genera! Iaycutaf tanks and piping. Gleady <br />identify locations of the Fallowing equipment, if installed: monitoring system cantrof panels; sensors monkoratg tank <br />annular spaces, sumps. dispenser pans, spill Dmtainem. <br />or other secandary cantas�mentarem: mechanical or eieetronic line leak detedlors; and in -tank liquid love <br />prohes ('rt used for Leak detectlon). In the space provided, <br />nate the date this She Phn was prepared. <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.