My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOKES
>
1001
>
2200 - Hazardous Waste Program
>
PR0527027
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 3:16:03 PM
Creation date
7/8/2020 2:44:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0527027
PE
2226
FACILITY_ID
FA0018140
FACILITY_NAME
CHRISP COMPANY
STREET_NUMBER
1001
STREET_NAME
STOKES
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14328003
CURRENT_STATUS
01
SITE_LOCATION
1001 STOKES AVE
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
copy of the Contingency Plan and any additional documentation will be <br /> attached to this Plan . <br /> vi) I certify that I have satisfied the requirement to prepare and implement a Plan under <br /> § 112 . 3 and all of the requirements under § 112 . 6 (a) . I certify that the information <br /> contained in this Plan is true . <br /> ( 1 ) Signature : 6 /. / SGL— Title : Safety Director <br /> (2) Print Name : William Buckman Date : 0 fla <br /> Record of Plan Review and Amendments <br /> Five Year Review (§ 112 . 5 (b)) . <br /> 1 ) Complete a review and evaluation of this SPCC Plan at least once every five years . As a <br /> result of the review, amend this Plan within six months to include more effective prevention <br /> and control measures for the facility, if applicable . Implement any SPCC Plan amendment as <br /> soon as possible, but no later than six months following Plan amendment . Document <br /> completion of the review and evaluation, and complete the Five Year Review Log in the <br /> attachments . If the facility no longer meets Tier I qualified facility eligibility, the <br /> owner/operator must revise the Plan to meet Tier II qualified facility requirements , or <br /> complete a full PE certified Plan . <br /> Table G4 Technical Amendments (§ 112 . 5(a) , c) and 112. 6(a) (2) <br /> This SPCC Plan will be amended when there is a change in the facility design, XD <br /> construction, operation, or maintenance that materially affects the potential for a <br /> discharge to navigable waters or adjoining shorelines . Examples include adding <br /> or removing containers , reconstruction, replacement, or installation of piping <br /> systems , changes to secondary containment systems , changes in product stored at <br /> this facility, or revisions to standard operating procedures . <br /> Any technical amendments to this Plan will be re- certified in accordance with FX] <br /> Section I of this Plan. ( § 112 . 6 (a) (2)) <br /> Plan Requirements <br /> Oil Storage Containers (§ 112 . 7(a) (3) (1)) : <br /> Table G2 Oil Storage Containers and Capacities <br /> This table includes a completed list of all oil storage containers XD <br /> (aboveground containers and completely buried tanks) with capacity of 55 <br /> US gallons or more , unless otherwise exempt from the rule . For <br /> mobile/portable containers, an estimated number of containers , types of oil, <br /> and anticipated capacities are provided . <br /> BULK STORAGE CONTAINERS <br /> Oil Storage Container (indicate Type of Oil Shell <br /> whether above ground (A) or Capacity <br /> completely buried (B)) (gallons) <br /> Chrisp Company <br /> Prepared By William Buckman, Safety Director Page 8 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.