Laserfiche WebLink
Appendix D : Inspection , Dike Drainage , and Personnel <br /> Training Logs <br /> Inspection, Dike Drainage , and Personnel Training Log <br /> An oil spill contingency plan and written commitment of resources is required for : <br /> • Flowlines and intra- facility gathering lines at oil production facilities and ; <br /> • Qualified oil -filled operational equipment which has no secondary containment. <br /> Table G46 Inspection Log and Schedule <br /> This log is intended to document compliance 'with §112 . 6(a)(3 )(iii); 112 . 8(c)(6) 112 . 8(4)(4); <br /> 112 . 9(b)(2); 112 .9(c)(3 ) ; 112 . 9(d)( 1 ); 112 . 12(c)(6); and 112 . 12(d)(4), as applicable. <br /> Date of Container/Piping/ Describe scope Observations Name/Signature Training <br /> inspection Equipment (or cite industry of inspector records <br /> standard) maintained <br /> separately <br /> This log kept separately from this document. <br /> Chrisp Company <br /> Prepared By William Buckman, Safety Director Page 26 of 31 <br />