Laserfiche WebLink
Appendix F : Dike Drainage Log <br /> Table G-18 Dike Drainage Log <br /> Date Bypass valve Rainwater Open bypass Drainage Observations Signature of <br /> sealed closed inspected to valve and activity inspector <br /> be sure no reseal it supervised <br /> oil (or sheen following <br /> is visible drainage <br /> ❑ ❑ ❑ ❑ <br /> This log is kept with the " SWPPP Weekly Visual Observation Worksheet. " <br /> Chrisp Company <br /> Prepared By William Buckman, Safety Director Page 28 of 31 <br />