My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 3:44:55 PM
Creation date
7/8/2020 3:37:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Top Filling Station -2- June 26, 2002 <br /> * It is not reasonable or necessary to conduct field-testing of multiple remedial technologies for <br /> the same media and the same hydrostratigraphic interval to evaluate the feasibility of remedial <br /> alternatives for a specific site. . All the proposed remedial technologies have been proven to <br /> remediate the constituents of concern. An initial screening of potential remedial technologies <br /> should be performed based on the site conceptual model developed for the subject site. <br /> Information collected during the site investigation concerning the geology and hydrogeology at <br /> the site, the nature and extent of the contamination and additional site specific information <br /> should be sufficient to evaluate the feasibility of the remedial alternatives for the site. Based on <br /> the initial screening,the most cost-effective remedial technology should be proposed for <br /> remediating the soil and/or groundwater at the site. After regulatory approval of the selected <br /> remedial alternative, field testing (if necessary)may be conducted to design the remedial system. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: necessary(as <br /> determined by the Fund) corrective action costs for action work directed and approved by the <br /> San Joaquin County Environmental Health Division (County)will be eligible for <br /> reimbursement at costs consistent with those pre-approved in this letter. However, depending on <br /> what happens in the field, some costs may not actually be necessary. If the Fund agrees that they <br /> were in fact necessary, the Fund will reimburse at reasonable rates (rates consistent with those <br /> pre-approved). <br /> In order for future costs for corrective action to be part of the expedited reimbursement <br /> process, they must be pre-approved in writing by Fund staff. <br /> All costs far corrective action must meet the requirements of Article 11, Chapter 16, <br /> Underground Storage Tank Regulations in order to be eligible for reimbursement. <br /> • The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However, if costs <br /> exceed the above pre-approved amounts,the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the AGE proposal in my pre-approval above,please be aware <br /> that you will be entering into a private contract: the State of California cannot compel you to <br /> sign any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> CaGiornia Environmenta/Frotecdoo Agency <br /> Zd RecfrJedPeper <br />
The URL can be used to link to this page
Your browser does not support the video tag.