Laserfiche WebLink
Feasibility Studies and Monitoring Well Installation Work Plan <br /> • TOP FILLING STATION <br /> 101 South Wilson Way, Stockton, California <br /> ' 1.0. INTRODUCTION <br /> ' Advanced GeoEnvironmental,Inc.(AGE)has prepared this work plan for installation of one ground <br /> water extraction well,one soil vapor extraction(S VE)well,one in-situ air sparge(IAS)well and six <br /> ground water monitoring wells at 101 South Wilson Way,Stockton,California(the site).Following <br /> ' well installations, AGE will perform feasibility pilot studies for soil and ground water corrective <br /> action including performance of a 24-hour ground water aquifer pumping test,performance of an <br /> 8-hour SVE pilot test, performance of a 48-hour IAS pilot test and performance of an 8-hour <br /> ' combined S VE/IAS pilot test. The location of the site is illustrated in Figure 1. A plan of the site is <br /> illustrated on Figure 2. <br /> 1 The proposed scope of work is in accordance with a letter directive from the San Joaquin County <br /> Environmental Health Department (SJCEHD), dated 17 January 2002 (Appendix A). As part of a <br /> Corrective Action Plan (CAP) for the site, performance of pilot tests are necessary to evaluate <br /> ' potential remediation options for soil and ground water at the site.Upon completion ofthe feasibility <br /> studies, a Problem Assessment Report (PAR) and a revised Remedial Action Plan (RAP) will be <br /> prepared. <br /> ' • This work plan is prepared in accordance with California Regional Water Quality Control Board- <br /> ' Central Valley Region (RWQCB) guidelines for the investigation of underground storage tanks <br /> (UST) sites. <br /> ' 2.0. BACKGROUND <br /> ' The site is located at 101 South Wilson Way, on the southwest corner of the intersection of <br /> Wilson Way and Market Street. The site is located in an area of low topographic relief at an <br /> elevation between 15 and 20 feet above mean sea level in the City of Stockton, San Joaquin <br /> ' County, California. The site is within the southeast quarter of Section 20, Township 1 North, <br /> Range 6 East,Mount Diablo Base and Meridian(Stockton West Quadrangle,7.5-Minute USGS <br /> Topographic Series, 1968, photo revised 1987). <br /> 2.1. SITE DESCRIPTION <br /> ' The Top Filling Station was a full service gasoline dispensing facility circa 1926 to 1998. One <br /> 550-gallon UST and two 4,000-gallon USTs,dispensers and product piping were removed from the <br /> east section of the site in September 1998.It is AGE's understanding that two USTs were previously <br /> removed from the southeast section of the site in December 1988. The site is currently occupied <br /> • by two building structures, but has been inactive since September 1998. <br /> Advanced GeoEnviranmen[al,Inc. <br />