My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011933
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0011933
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:52:06 PM
Creation date
7/9/2020 8:22:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011933
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 28 October 2005 <br /> AGE-NC Project No 95-0130 <br />' Page 7 of 13 <br /> MTBE was detected in the April and June 2005 influent SVE air flow samples at concentrations of <br /> 41 pg/1 and 22 pg/l, respectively, MTBE was detected in April 2005 effluent air flow sample at a <br /> concentration of 7 4 pg/l <br />' Analytical results of SVE air samples are summarized in Table 5 GeoTracker confirmation pages <br /> of the submitted laboratory electronic deliverable format (EDF) files are included in Appendix D <br />' A plot of laboratory analysis of SVE influent TPH-g air stream concentrations versus time is <br /> included with Appendix F The laboratory reports (CTEL Project Nos 0504062 and 0506200) and <br /> chain of custody forms are presented in Appendix G <br /> I <br /> 3 3 3 MASS CALCULATION OF RECOVERED PRODUCT <br />' The hydrocarbon mass removed during the SVE operating period was calculated using the equation <br /> M = C•Q•t <br />' where M =cumulative mass recovered (kg) <br /> C =vapor concentration (kg/m') <br /> lieQ =extraction flow rate (m'/hr) <br /> t= operational period, in hours <br />' Between 08 March and 05 April 2005, the SVE unit operated a total of 669 hours (Table 6) The <br /> average analytical results(approximately 5000 pg/1)of the influent SVE air flow samples(Table 5), <br />' average diluted SVE influent flow rates(approximately 60 scfm,Table 6)and the operational period <br /> (669 hours) were used to calculate the approximate mass of extracted gasoline during this period <br /> During the second quarter 2005 operational period,the mass of hydrocarbons extracted by the SVE <br /> system was calculated to be approximately 752 pounds, or equivalent to a volume of 120 gallons of <br /> gasoline Added to the estimated 2,220 gallons of hydrocarbons extracted from the SVE system since <br />' 31 August 2004 (start-up), the total volume of hydrocarbons extracted to date is estimated at 2,340 <br /> gallons (Table 7) A plot of the cumulative mass (pounds) of hydrocarbons extracted to date is <br /> included in Appendix F,the volume/mass calculations for extracted hydrocarbons are included with <br />' Appendix H <br />' 4.0 GROUND WATER EXTRACTION-TREATMENT REMEDIATION <br /> Between 08 March 2005 and 03 June 2005, an interim remediation ground water P&T system was <br />' continuously operated at the site The ground water treatment operation and maintenance procedures <br /> for the site were outlined in AGE's Interim Remediation Work Plan-May 2003,dated 21 May 2003 <br /> Advanced GcoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.