Laserfiche WebLink
i <br /> 28 October 2005 <br /> AGE-NC Project No 95-0130 <br />' Page 7 of 13 <br /> MTBE was detected in the April and June 2005 influent SVE air flow samples at concentrations of <br /> 41 pg/1 and 22 pg/l, respectively, MTBE was detected in April 2005 effluent air flow sample at a <br /> concentration of 7 4 pg/l <br />' Analytical results of SVE air samples are summarized in Table 5 GeoTracker confirmation pages <br /> of the submitted laboratory electronic deliverable format (EDF) files are included in Appendix D <br />' A plot of laboratory analysis of SVE influent TPH-g air stream concentrations versus time is <br /> included with Appendix F The laboratory reports (CTEL Project Nos 0504062 and 0506200) and <br /> chain of custody forms are presented in Appendix G <br /> I <br /> 3 3 3 MASS CALCULATION OF RECOVERED PRODUCT <br />' The hydrocarbon mass removed during the SVE operating period was calculated using the equation <br /> M = C•Q•t <br />' where M =cumulative mass recovered (kg) <br /> C =vapor concentration (kg/m') <br /> lieQ =extraction flow rate (m'/hr) <br /> t= operational period, in hours <br />' Between 08 March and 05 April 2005, the SVE unit operated a total of 669 hours (Table 6) The <br /> average analytical results(approximately 5000 pg/1)of the influent SVE air flow samples(Table 5), <br />' average diluted SVE influent flow rates(approximately 60 scfm,Table 6)and the operational period <br /> (669 hours) were used to calculate the approximate mass of extracted gasoline during this period <br /> During the second quarter 2005 operational period,the mass of hydrocarbons extracted by the SVE <br /> system was calculated to be approximately 752 pounds, or equivalent to a volume of 120 gallons of <br /> gasoline Added to the estimated 2,220 gallons of hydrocarbons extracted from the SVE system since <br />' 31 August 2004 (start-up), the total volume of hydrocarbons extracted to date is estimated at 2,340 <br /> gallons (Table 7) A plot of the cumulative mass (pounds) of hydrocarbons extracted to date is <br /> included in Appendix F,the volume/mass calculations for extracted hydrocarbons are included with <br />' Appendix H <br />' 4.0 GROUND WATER EXTRACTION-TREATMENT REMEDIATION <br /> Between 08 March 2005 and 03 June 2005, an interim remediation ground water P&T system was <br />' continuously operated at the site The ground water treatment operation and maintenance procedures <br /> for the site were outlined in AGE's Interim Remediation Work Plan-May 2003,dated 21 May 2003 <br /> Advanced GcoEnvironmental,Inc <br />