My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012037
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0012037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:55:16 PM
Creation date
7/9/2020 8:32:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012037
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l11 March 2002 <br /> . AGE-NC Project No 95-0130 <br /> Page 6of13 <br />' including a 24-hour ground water extraction pilot test,an 8-hour SVE pilot test,a 48-hour IAS <br /> pilot test and an 8-hour combined SVE/IAS pilot test <br /> The scope of work will consist of the following tasks <br /> • Permitting, planning and pre-field work activities, <br /> • Drilling and well installation, <br /> • Performance of a 24-hour ground water aquifer pumping test, <br /> • Performance of an 8-hour SVE pilot test, <br /> • Performance of a 48-hour IAS pilot test, <br />' 0 Performance of an 8-hour SVE/IAS pilot test, and <br /> • Preparation of a PAR and a revised RAP <br />'. 3 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment permits will be submitted to the SJCEHD As required by SJCEHD <br /> 1 permitting,a health and safety plan will be prepared in accordance with Occupational Safety and <br /> Health Guidance ManualforHazardous Waste Site Activities(National Institute for Occupational <br /> Safety and Health Administration, U S Coast Guard and U S Environmental Protection <br />' Agency, 1985) Prior to drilling activities, each proposed drilling location will be clearly <br /> marked and a utility clearance obtained through Underground Service Alert <br />' 3 2 WELL INSTALLATION <br />' Based on soil and ground water data collected during the investigation of petroleum- <br /> hydrocarbon impact, AGE proposes installation of nine wells in the following areas <br />' a One 6-inch diameter ground water extraction well (EW-1) located approximately 5 to <br /> 15 feet east of soil vapor extraction well VW-3 and screened between 35 and 55 feet <br /> bsg, <br />' 0 One 4-inch diameter SVE well (VW-4) located approxunately 15 to 25 feet southwest <br /> of VW-3 and screened between 10 and 40 feet bsg, <br />' 0 One 2-inch diameter IAS well (AW-1) located approximately 5 to 15 feet northeast of <br /> • soil vapor extraction well VW-2 and screened between 50 and 55 feet bsg, <br /> • One 2-inch diameter ground water monitoring well (MW-8) located approximately 10 <br />' Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.