Laserfiche WebLink
I <br />' 24 December 2001 <br /> . AGE-NC Project No 95-0130 <br />' Page 5 of 5 <br /> • Continued quarterly ground water monitoring, the next quarterly ground water monitoring <br /> event Is tentatively scheduled for December 2001 <br /> • Continued utilization of wells VW-1B, VW-1C, VW-2A, VW-2B, VW-3A and VW-3B for <br /> characterization of ground water conditions In the "core area" <br /> • Performance of a ground water aquifer pumping test to predict general aquifer characteristics <br /> at the site in order to design an appropriate Interim ground water pump and treat remediation <br /> system <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this Investigation are made from a limited number <br /> of available data points (ground water samples), and subsurface conditions may vary away from <br /> I . these data points No other warranty, expressed or Implied, is made as to the professional <br /> recommendations contained in this report <br /> 1 <br /> I <br /> Advanced GeoEnvlronmental,Inc <br /> I <br />