My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012265
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0012265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:21:30 PM
Creation date
7/9/2020 9:01:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012265
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 May 1995 <br />• AGE-IAC-95-0130 <br /> Page 3 of 4 <br /> capping, amid sealing with tape <br /> 6) Label and log soil samples on a chain-of-custody form <br /> 7) Stoie the samples under ice and transport the samples in a chilled container to a <br /> State certified laboratory for analysis <br /> 9) Log auger returns in accordance »rth the Unified Soil Classification System <br /> 10) Scieen auger returns and soil sample duplicates for the presence of\olatrle organics <br /> using a photo-ionization detector (PID) pie-calibrated to rsobutylene <br /> 11) Place auger returns on plastic sheeting and stole on-site pending analytical results <br /> 12) Analyze selected soil samples far total petroleum hydrocarbonscluantified as gasoline <br /> (TPH-g) and volatile aromatics (benzene, toluene, ethylbenzene and \}lenes <br /> BTE&X), in accoidance \%rth EPA methods 5030/8015m and 5020, respectnely <br />. 13) Decontaminate sampling egUIPment in an alconox solution and r ruse t\\ice a ith water <br /> pr ror to each sampling run <br /> 14) Steam-clean auger flights after drrllrnO each soil bonne, <br /> 15) Complete all monrtormg\%ells in accordance \\ith the x\ell design illustrated in Figuie <br /> 4 complete vadose remediation \\ells in accordance with the N\ell design illustrated <br /> rn F)gule 5 <br /> 16) Suivey and develop each new rriorrrtorrng well Each new cell \gill be surveyed <br /> relative to existing 111011tolrng wells <br /> 17) No sooner than 48 hours after installation, measure to the nearest 001 foot, the <br /> static water level in the new wells <br /> 13) Using a bailee or submersible pump, surge and purge all wells Each well will be <br /> purged of standing water to stabilize temperature, pH and conductivity Well <br /> parameters will be measured at one-gallon intervals A minimum of three %vell <br /> volumes of water will be removed from each well <br /> 19) After stabilization, collect one groundwater sample from each NN ell Samples will be <br />. collected ria EPA 40-ml vials Each sample will be collected using a new disposable <br /> bailer <br />
The URL can be used to link to this page
Your browser does not support the video tag.