Laserfiche WebLink
1 <br /> EXPLANATION <br /> WATERLOO ROAD + Groundwater monitoring well <br /> �- — — -- — A/B/C TPH(G) (Total Petroleum <br /> Planter hydrocarbons as Gasoline)/ <br /> Planter -- Benzene/MTBE concentrations <br /> in ppb <br /> <501<0 50/23+ / + MTBE by EPA Method 8260 <br /> • • Former <br /> MW-2-* USTS / <br /> 89114125+., <br /> Dispenser , <br /> IslandsCar <br /> t<t <br /> Trash Wash I <br /> / Enclosure Convenience Store I <br /> 1 � <br /> <50/<0 50/<2+ <br /> MW-3 <br /> N. <br /> 0 40 <br /> Source Figure modiried from drawing provided by RRM engineering contracting firm Scale In Feet <br /> CONCENTRATION MAP FIGURE <br /> im GETTLER - RYAN INC. Chevron Service Station #9-9840 <br /> 6747 Sierra Ct, Suite J 4344 Waterloo Road 2 <br /> Dublin, CA 94568 (925) 551-7555 Stockton, California <br /> PROJECT NUMBER REVIEWED BY DATE REVISED DATE <br /> 386846 October 5 2001 <br /> FILE NAME P Enviro Chevron 9-9840 Q01-9-9840 DWG I Layout Tab Con4 <br />