My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008457
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2900 - Site Mitigation Program
>
PR0541976
>
ARCHIVED REPORTS_XR0008457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:21:05 PM
Creation date
7/9/2020 9:48:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008457
RECORD_ID
PR0541976
PE
2960
FACILITY_ID
FA0024090
FACILITY_NAME
CHEVRON FACILITY #9-9840
STREET_NUMBER
4344
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
10102157
CURRENT_STATUS
01
SITE_LOCATION
4344 WATERLOO RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
View images
View plain text
n ' <br /> Chevron Groundwater Monitoring Report QQ2001) Page 2 of 2 <br /> Facility 99-9840-4344 Waterloo Road,Stockton CA Date October 2,2001 <br /> DISCUSSION: <br /> This groundwater monitoring and"sampling event was performed by Gettler-Ryan Inc on July 23,2001 Three <br /> monitoring wells were monitored and sampled during this event TPHg was detected at a concentration of 65 µg/l <br /> in the sample collected from MW-I Benzene was detected at a concentration of 0 61 µg11 in the sample collected <br /> from MW-I MtBE was detected using EPA Method 8260 at concentrations of 180 µg11 in the sample collected <br /> from MW-I and 37 Ng/l in the sample collected from MW-2 Groundwater elevations across the site decreased an <br /> average of approximately 4 45 feet this quarter Groundwater flow was to the northeast at 0 002 ft/ft, consistent <br /> with historical data <br /> LIMITATIONS: <br /> The findings presented in this letter are based on data and interpretations provided by Gettler-Ryan, Inc Gettler- <br /> Ryan's report is attached The data presented in this summary is accurate only to the degree implied by the sources <br /> and methods used No warranty, expressed or implied, is made by SECOR <br /> If you have any questions,please feel free to call us at(916) 861-0400 <br /> Sincerely, <br /> SECOR Internattonal Inc <br /> William E Brasher, P E <br /> Project Manager <br /> ATTACHMENTS: <br /> • Table I —Screen Intervals <br /> • Attachment A—August 24,2001 Groundwater Monitoring& Sampling Report by Gettler-Ryan Inc <br /> cc Bob Cochran,Chevron Products Company, P O Box 6004, San Ramon, CA 94583-0804 <br /> Marty Hartzell, RWQCB-CVR, 3443 Routier Road, Suite A, Sacramento, CA 95827 <br /> Joseph Budisehch,4514 Waterloo Road, Hwy 88, Stockton,CA 95215 <br /> Kevin Lee, Subway,4410 Waterloo Road, Stockton, CA 95215 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).