My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008586
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2900 - Site Mitigation Program
>
PR0543607
>
ARCHIVED REPORTS_XR0008586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:15:37 PM
Creation date
7/9/2020 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008586
RECORD_ID
PR0543607
PE
3528
FACILITY_ID
FA0006343
FACILITY_NAME
STOCKTON MOBIL 3*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
02
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Beacon Station No 12419 <br /> January 26,2006 <br /> Stockton California Groundwater Monitoring Report <br /> yr <br /> Groundwater Monito'ring Results <br /> Depth-to-groundwater measurements were subtracted from the surveyed TOC elevations to <br /> •i <br /> calculate groundwater elevations Groundwater elevation data were used to construct the <br /> groundwater elevation contour map shown on Figure 2 The data indicate groundwater in the <br /> underground storage tank area flowed roughly northward under a gradient of approximately <br /> 0 001 <br /> i <br /> Groundwater analytical results are summarized in Table I Benzene concentration data from' <br /> this sampling event were used to construct'the benzene isoconcentration map shown on Figure <br /> 3 The analytical report is contained in Attachment C <br /> Vapor Extraction System Monitoring <br /> Installation of a vapor extraction system (VES) and an air sparge (AS) was completed in late, <br /> July 2005 The San Joaquin Valley Air Pollution Control District (APCD) issued Authority to <br /> Construct permit No N-4910-1-1 on July 14, 2005 Operation of the VES was initiated on, <br /> August 2, 2005 Inspection of the VES by the APCD was conducted on October 11, 2005 <br /> I he location of the ieinedjation system compound and-underground piping is shown on <br /> Figure 4 The VES consists of a positive-displacement blower rated at 100 cubic feet per <br /> minute (cfni), an E,VAX 520 catalytic oxidizer and other associated equipment as shown in the <br /> pi ocess flow diagram on Figure 5 The VES is Set up to extract vapors from vapor extraction <br /> wells VW-1 and VW-2, and monitoring wells MW-7, MW-9, MW-l0 and MW-,l I Soil vapor _ <br /> flew from each well is cuntiolled by individual valves The AS consists of a 1 5 h,)-sepowel, <br /> -7 5 cfin air compressor and oWer_associated 'equipment as shown on-Figuic 5 1 lie-AS is set up - �f- <br /> to sparge air to sparge wells AS-1, AS-2, AS-3 and monitoring wells MW-1 and MW-3 Air <br /> sparging was not conducted dui ing fourth quare c i 2005 <br /> The VES reporting period for this report is September 26 to December 22, 2005 The VES <br /> operated-for-d-total�of approximately=82-days- --Influent-an&effluent=vapor-samples were`=` <br /> collected en October 11, November 7 and December 8, 2_005 Analytical reports are con_tained __ <br /> Tiri-Attachriient C�-Vapor extraction systemdata are summarized jn Table 2 Y r �T <br /> The average influent flow during the third quarter was approximately 20 standard cubic feet per <br /> minute During the fourth quarter reporting period, approximately 1,174 pounds of TPHg and <br /> 0 8 pound of benzene were removed by the VES As of the end of the fourth quarter reporting <br /> period, approximately 1,972 pounds of TPHg and 1 4 pounds of benzene have been removed by <br /> the VES <br /> GeoTracker Electronic Data Deliverables <br /> i <br /> The analytical electronic data deliverable (EDD) was prepared and uploaded by Kiff The <br /> groundwater level EDD (GEO_WELL) was prepared and uploaded by Horizon The <br /> GEO_WELL'upload confirmation sheet for this quarter and the Quarterly Monitoring Report <br /> EDD (GEO_REPORT) upload confirmation sheet for the previous quarter are contained in <br /> Attachment E <br /> j <br /> 419gmr Q405 <br /> Project No 1419 48 2 HORIZON ENVIRONMENTAL INC- <br />
The URL can be used to link to this page
Your browser does not support the video tag.