Laserfiche WebLink
Former Beacon Station No 12419 March 18,2002 <br /> Stockton California Problem Assessment Report/Corrective Action Plan <br /> and 0 25 pound benzene were recovered from the aquifer during the 47 3-hour aquifer <br /> Pumping test Aquifer pumping test figures are contained in Appendix G <br /> 9.2 Soil Vapor Extraction Test <br /> A four-hour soil vapor extraction test (SVET) and an air sparge test (AST) were performed <br /> separately in October 1999 to evaluate soil vapor extraction and air sparging as remedial <br /> alternatives for the site Tabulated SVET and AST field data are contained in Appendix H <br /> Soil vapors were extracted from soil vapor wells VW-1 and VW-2 while monitoring for <br /> induced vacuum in monitoring wells MW-7 and MW-9 The daily TPHg mass extraction <br /> rate ranged from 21 0 to 292 pounds per day (ppd) The maximum flow rate achieved was <br /> 9I scfm from VW-I at a wellhead vacuum of 60 inches of H2O Vacuum influence ranging <br /> from 0 3 to 0 4 inches H2O were observed in well MW-9 Approximately halfway through <br /> the VET, a vacuum response ranging from 0 05 to 0 8 was observed in well MW-7 (4 f'b�� <br /> The vapor well VW-1 (screened interval 34-44 feet bsg) maximum extraction flow rate of 91 <br /> standard cubic feet per minute (scfm) at low vacuum, and measurable induced vacuum <br /> response at 56 feet (Figure 9) from extraction well, indicated vapor extraction is a feasible <br /> soil remedial alternative Vapor well VW-2 (screened interval 15-25 feet bsg) exhibited <br /> low vapor flow characteristics with a maximum flow rate of 14 scfm possibly due to finer- <br /> grained sediments in the screened interval The radius of influence for vapor well VW-2 is <br /> uncertain because no vacuum response was detected in the observation wells, but is <br /> estimated as less than 20 feet <br /> 9.3 Air Sparge Test <br /> An 8-hour AST was performed on October 20, 1999 and consisted of the injection of air into <br /> well air sparge well AS-I while monitoring pressure responses in wells MW-3 and MW-9 <br /> A measured injection flow rate of 13 actual cubic feet per minute (acfm) was established <br /> 419PARCAP3-02 doc 18 <br /> Project No 1419 23 HORIZON ENVIRONMENTAL INC. <br />