My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008866
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2900 - Site Mitigation Program
>
PR0543607
>
ARCHIVED REPORTS_XR0008866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:40:33 PM
Creation date
7/9/2020 10:21:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008866
RECORD_ID
PR0543607
PE
3528
FACILITY_ID
FA0006343
FACILITY_NAME
STOCKTON MOBIL 3*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
02
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Beacon Station No 419 August 2, 1996 <br /> Stockton, California Assessment Report <br /> SITE DESCRIPTION AND BACKGROUND <br /> The site is an operating gasoline service station located on the southwestern corner of the <br /> intersection of Waterloo Road and Sierra Lane in Stockton, California Site facilities include <br /> a station building, two gasoline product dispenser islands located east of the station building, <br /> and three underground gasoline storage tanks (USTs) located toward the eastern property <br /> boundary Locations of these and other pertinent site features are shown on the Site Plan <br /> (Figure 2) <br /> Previous environmental work at the site was performed by AMV and others This previous <br /> work included drilling three onsite soil borings (SB-1 through SB-3) in March 1991, the <br /> removal and replacement of the UST's in October 1993, and drilling three additional soil <br /> borings and installation of three onsite 4-inch inside diameter (ID) groundwater monitoring <br /> wells (MW-1 through MW-3) in July 1994 Gasoline hydrocarbons were found to be <br /> present in soil and groundwater during these previous investigations Locations of the soil <br /> borings, UST's, and groundwater monitoring wells are shown on Figure 2 Groundwater <br /> was found to be present at a depth of approximately 70 feet below ground surface (bgs) <br /> FIELD WORK <br /> Field work was conducted between May 6 through May 29, 1996 in accordance with the <br /> Horizon Site Safety Plan dated May 3, 1996 Prior to performing the soil borings, <br /> Underground Service Alert was notified Prior to drilling, an encroachment permit was <br /> obtained from the County of San Joaquin Department of Public Works for the offsite <br /> groundwater monitoring well, and well permits were obtained from the San Joaquin County <br /> Environmental Health Division of Public Health Services for all of the soil borings and <br /> 40 1419 11-RPT 2 HORIZON ENVIRONMENTAL.INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.