Laserfiche WebLink
1 <br /> ill ' i <br /> Nations Groundwater Associates <br /> 0 <br /> 40 HYDROGEOLOGISTS&GEOLOGISTS <br /> Pk4g,1 <br /> �14 <br /> February 15, 1995 MAY <br /> 1 1 1995 <br /> rNy/R01VMCNr, <br /> PIEWITisE'R',"s TH <br /> Mr RandallK Stephenson <br /> Ultramar Inc <br /> 525 West Third Street <br /> Hanford, California 93232-0466 <br /> Subject First Quarter 1995 Groundwater Monitoring Report <br /> Beacon Station #419 <br /> 2350 Waterloo Road, Stockton, California <br /> Dear Mr Stephenson <br />• This report documents the results of quarterly groundwater monitoring conducted on Janu 13 " <br /> 1995 at the subject site(Figure 1) The monitoring included measurements of depth to groundwater, <br /> subjective analysts for free product, groundwater purging and collection of groundwater samples <br /> All field activities pertaining to events in this report were conducted according to the Ultramar Field <br /> Procedures included in the Attachments <br /> GROUNDWATER ELEVATIONS <br /> Prior to purging, DouIos Environmental personnel collected depth to groundwater measurements <br /> Groundwater level data from July 1994 to dat summarized in Table 1 On the basis of the <br /> current measurements,groundwater flows to figure 2) at a gradient of less th8n 0 0�$l$__✓ <br /> Groundwater levels have increased an avera approximately 4 5 feet compared to the last <br /> monitoring event �'UQ— <br /> 4" <br /> 0 a�- <br /> 2 <br /> i <br /> P.O.Boz 276325 Sacramento,California 95827-6325 (916)36148095 <br /> (916)3614M%FAX <br />