My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008880
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2900 - Site Mitigation Program
>
PR0543607
>
ARCHIVED REPORTS_XR0008880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:42:12 PM
Creation date
7/9/2020 10:24:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008880
RECORD_ID
PR0543607
PE
3528
FACILITY_ID
FA0006343
FACILITY_NAME
STOCKTON MOBIL 3*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
02
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-2 <br /> The soil generated from the soil borings was stored in 55-gallon drums and labeled with the <br /> corresponding boring number, date, and address of the facility <br /> 2.0 DECONTAIVIINATION AND DISPOSAL PROCEDURES <br /> 2.1 Equipment Decontamination <br /> All equipment that came in contact with potentially contaminated soil, air, or water was <br /> decontaminated before each use Decontamination consisted of steam-cleaning, a high-pressure, <br /> hot-water rinse, or tnsodium phosphate (TSP) wash and freshwater rinse, as appropriate <br /> Drilling and sampling equipment was decontaminated as follows <br /> 1 Drill ng augers, drill rods, and drill bits were steam-cleaned prior to use and between <br /> borings Visible soil, grease, and other impurities were removed <br /> 2 Soil sampling equipment was steam-cleaned prior to use and between each boring <br /> Prior to individual sample collection, sampling devices were also cleaned in a TSP <br /> solution and rinsed twice in clean water Any visible soil residue was removed <br /> 3 Stainless steel or brass soil sampling tubes were washed in a trisodium phosphate <br /> (TSP) solution and rinsed with clean water <br /> 3.0 FIELD MEASUREMENTS <br /> Field data were collected during various sampling and monitoring activities, this section <br /> describes routine procedures followed by personnel performing field measurements The <br /> methods presented below were intended to ensure that field measurements were consistent and <br /> reproducible when performed by various individuals <br /> 3.1 Buried Utility Locations <br /> Prior to commencement of work on site, AMV contacted appropriate utility companies to have <br /> underground utility lines located AMV researched the location of all underground utilities using <br /> past site construction and surveying plans and by conducting a ground reconnaissance of the <br /> area All work associated with the borings was preceded by hand augering to a minimum depth <br /> of 5 feet below grade to avoid contact with underground utilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.