My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009036
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
223
>
3500 - Local Oversight Program
>
PR0545813
>
ARCHIVED REPORTS_XR0009036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:20:24 PM
Creation date
7/9/2020 1:11:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009036
RECORD_ID
PR0545813
PE
3528
FACILITY_ID
FA0000713
FACILITY_NAME
RIPONA MARKET
STREET_NUMBER
223
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26106014
CURRENT_STATUS
02
SITE_LOCATION
223 W WASHINGTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Rtpona Market <br /> Vertical Groundwater Investigation II Report <br /> Page 7 <br /> MTBE Confirmed if present by Method 8260 <br /> $ 3i�Drj� <br /> Table of Laboratory Water Sample Results ) <br /> Sam le I D Gasoline Benzene Toluene E-BenzenL_j Xylenes Ox mates <br />' MW-5 I <005 <03 <03 <03 1 <06 ND <br /> ND=Non Detect NA=Not Analyzed, Gasoline reported in Mg/L BTEX and Oxygenates in pg/L <br /> Groundwater Elevations 08/31/05 <br /> Well Collar Elevation DTW GW Elevation <br /> MW-1 6328 2706 3622 <br /> MW-2 6359 2732 3627 <br /> MW-3 638 2759 3621 <br /> MW-4 6352 273 36 22 <br /> MW-5 16318 12732 35 86 <br /> 2.1 Drilling <br />' Permits were obtained as necessary for all bonngs before drilling began The soil <br /> boring was accomplished using a mobile mounted drilling ng employing the use <br /> of 10 inch - and 8 7/8 inch o d hollow stem flight augers All drilling equipment <br /> was thoroughly steam-cleaned before drilling began, to prevent the introduction <br /> of contamination from off site, and between bonngs to prevent cross <br /> contamination <br /> The borings were logged under the direct supervision of a registered professional <br />' using the Unified Soil Classification System The color, texture, moisture, <br /> plasticity (if applicable), consistency of the earth materials, pertinent soil or <br /> bedrock characteristics, and any evidence of contamination will be noted All <br />' water-bearing zones and the depths at which they were encountered are noted on <br /> these logs Upon termination, the boring was completed as a deep monitoring <br /> well with as five foot screen and backfilled with concrete grout, after a Bentonite <br />' seal has been placed <br /> The cuttings from the drilling operation were containerized on-site during drilling <br /> for proper disposition The proper method of disposal will be dependent upon <br /> results of laboratory analysis. This disposal will be the responsibility of the client <br /> unless other arrangements are made <br /> 2.2 Soil Sampling <br /> All soil sampling equipment was thoroughly steam-cleaned before and between <br /> sampling to prevent cross contamination Relatively undisturbed soil samples <br />
The URL can be used to link to this page
Your browser does not support the video tag.