Laserfiche WebLink
e <br /> Ripona Market <br /> First Quarter Groundwater Sampling Report February 2004 <br /> Page 2 <br /> i <br /> Groundwater flow direction was North 59 East with a gradient of 0 0004 ft/fl similar to <br /> past monitoring events The groundwater elevations and groundwater flow direction are <br /> shown on Figure 2 Site Map / Groundwater Flow <br /> Groundwater Elevations 02/02/04 <br /> Well Collar Elevation DTW GW Elevation <br /> MW-1 6328 2491 3837 <br /> MW-2 6359 2521 3838 <br /> MW-3 638 2543 3837 <br /> MW-4 6352 2515 3837 <br /> The analytical laboratory reported groundwater contamination by MTBE (2070 ug/1) in <br /> well MW-2, located at the edge of the tank basin Trace concentrations of gasoline and <br /> aromatic compounds were detected in the deep well MW4 MTBE was not detected in <br /> well MW4 Groundwater chemistry for the February 2, 2004 event is presented in Figure <br /> 3 <br /> Laboratory Groundwater Sample Results Petroleum Com ounds 02/02/04 <br /> Sample I D j Gasoline Benzene I Toluene I E-Benzene I Xylenes I MTBE I t-Butanol I TAME I DO <br /> . MW-1 <0 05 <0 3 <0 3 <0 3 <0 6 <0 5 <5 <0 5 041 <br /> MW-2 <0 05 <30 <30 <30 <60 2070 <500 <50 037 <br /> MW-3 <0 05 <0 3 <0 3 <0 3 <0 6 <0 5 <5 <0 5 073 <br /> MW-4 014 94 42 29 18 <0 5 <5 <0 5 4 19 <br /> ND=Non Detect NA=Not Analyzed <br /> Mg/L for gasoline&Dissolved Oxygen pg/L for BTEX,MTBE,and 8260 Oxygenated Compounds <br /> The lateral and vertical extent of MTBE, the contaminant of concern has been defined <br /> laterally and vertically to be restricted to the immediate vicinity of the former <br /> underground storage tanks A survey of potential contamination plume receptors within <br /> 2,000 feet of the point of release identified water well approximately 2000 feet from the <br /> former underground storage tanks It appears that the release does not pose a nsk to the <br /> identified water wells in the vicinity of Ripona Market Quarterly monitoring of all wells <br /> will continue If the preliminary results of the recent groundwater monitoring are <br /> confirmed, an evaluation of the potential long term threat of the impacted groundwater <br /> will be conducted and a corrective action plan prepared including recommendations for <br /> addition work or site closure <br />