Laserfiche WebLink
M.J. Kloberdanz & Associates <br /> Health & Safety Plan <br /> 10 HEALTH AND SAFETY PLAN <br /> M J Kloberdanz&Associates has adopted the following health and safety procedures for working with organic vapors <br /> and liquid contaminants encountered during drilling and excavation of subsurface soil The purpose of this program is <br /> to provide health and safety precautions for the initial and subsequent site visits until the nature and magnitude of the <br /> contaminants have been defined <br /> I I Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean ups will have an assigned <br /> responsibility The outlined responsibilities will establish standards for personnel protective wear safety <br /> procedures and provide for emergenc-, actions which could arise during project operations <br /> 12 Project Manager(PM) <br /> The Project Manager directs all project operations Project Manager (PM), in cooperation with the Project <br /> Safet% Officer(PSO),has the pnman responsibility for ensuring that the safety plan is read,signed,and fully <br /> understood by all employees and outside persons allowed around or within designated working perimeters of <br /> the job site <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during project operations, all <br /> employees adhere strictly to the Health and SafetN Plan <br /> 13 Project Safeq Officer(PSO) <br />• The FSO shall direct and ensure that all employees comply with the Health and Safety Plan The PSO has the <br /> primary responsibility for <br /> I Assuring that appropriate personnel protective equipment is available and properly utilized by all <br /> on-site personnel <br /> 2 Assuring that personnel are aware of the provisions of this plan,are instructed in the work practices <br /> necessary to ensure safety,and in planned procedures for dealing with emergencies <br /> Assuring that personnel are aware of the potential hazards associated with site operations <br /> 4 Monitoring the safety performance of all personnel to ensure that the required work practices are <br /> employed <br /> 3 Correcting any work practices or conditions that may result in injury or exposure to hazardous <br /> substances <br /> 6 Preparing any accident/incident reports(see attached Accident Report Form) <br /> 14 Project Employee <br /> Project Employees involved in on-site investigations are responsible for <br /> 1 Taping all reasonable precautions to prevent injury to themselves and to their fellow employees <br /> 2 Implementing Health and Safety Program and reporting to the PSO for ani action deviating from <br /> the anticipated conditions described in the Health and Safety Plan <br /> 15 Special instructions <br /> It is the responsibility of the Project Manager and the Health and Safety Manager to review the available site <br /> information to deternune, to what degree the Health and Safety Plan will be implemented Each site will be <br /> handled on a case-by-case basis <br />